10-7-11

We were at the mill today, cutting up a few more logs into window jamb extension material. We also cut two short 6x8 beams that will be the carrying beams above the stairwell. These beams will allow us to tear out the temporary walls currently enclosing the stairwell and create an open stairwell with a log support post.

no additional Window Jamb Extensions pics for today

     
 

10-8-11

All the material we cut at the mill is now stacked and stickered in the living room. Stephen took this as a new addition to his "indoor playground".

click here for more Window Jamb Extensions pics

     
 

10-22-11

Jeff started installing the jamb extensions tonight, starting with the small header pieces. These are 3/4" strips with a 45-degree bevel.

click here for more Window Jamb Extensions pics

     
 

10-23-11

Jeff cut a bunch of side jamb extensions and sill material to rough length and began labeling for each window.

no additional Window Jamb Extensions pics for today

     
 

10-24-11

Tonight was more of the same, but cutting up the sill material. The sills will be made of two overlapping slabs. The lower boards (material pictured at left) are around 1-1/4" thick. The upper boards are about 3/4" thick.

no additional Window Jamb Extensions pics for today

     
 

10-28-11

Jeff has started working on installing the larger jamb extension material. This includes a header extension, two side jamb extensions, and the double slab sills. For each window, the header and sill will go on first, then the side pieces will be screwed in between.

click here for more Window Jamb Extensions pics

     
 

10-29-11

Jeff got a few more boards installed today with a little help from Lydia and Stephen.

click here for more Window Jamb Extensions pics

     
 

10-30-11

Stephen and Jeff worked on a couple more windows today, while Jillena finished off the very last of the chink prepping!

click here for more Window Jamb Extensions pics

     
 

11-4-11

Jeff installed another sill tonight. Earlier, Bob was out to help with the stairwell overhead framing.

click here for more Window Jamb Extensions pics

     
 

11-5-11

Jeff, Jillena and Stephen all worked together today on more jamb extensions. Jillena was also busy painting the bedroom!

click here for more Window Jamb Extensions pics

     
 

11-6-11

Jeff put up a few more side extensions today while Jillena worked on painting some of the kitchen.

no additional Window Jamb Extensions pics for today

     
 

12-9-11

Jeff worked on the windows again today while Bob worked on the bathroom door latch.

no additional Window Jamb Extensions pics for today

     