11-8-13
Jeff and Stephen worked on two projects today: wrapping the boiler vent pipe in insulation and adding a few more lath sheets to the bottom of the deck.
The boiler vent pipe needed to be insulated to prevent possible ice crystals forming inside and finding their way back into the boiler.
click here for more Finishing Touches pics |