INTERIOR CHINKING
2-4-11
 
 
The west wall is almost finished up to where Jillena could reach.
Jillena has been being more particular in shaping the insulation to the contour of the logs, and using narrower lath strips. This will give us narrower chink lines and leave as much log showing as possible.
     
   
Jillena hanging from a scaffold frame. Done for the day!
<-- BACK TO "Winter 2010-2011 Projects"  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s