GABLE SIDING
2-4-11
 
 
Loading the planks onto the forks. The planks ended up getting stacked and stored in the basement.
Jeff, Bob, and John moving the scaffolding pieces inside through the front door. (Feels good to say that.)
     
 
All the scaffolding is now inside and ready to set up on the west wall.
The new look of our home, with the plastic cover temporarily removed from the front door.
<-- BACK TO "Winter 2010-2011 Projects"  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s