The front gable wall has all of the siding boards installed. Between the boards are 1/2" gaps that will soon be covered with the batten strips. |
|
Scraping a different kind of surface mold off one of the 13-3/4" boards. |
The dirty green water on this board is evidence of how thick the mold was. Jillena is using bleach in the water, so once the board is rinsed and dried, it will be it's original bright color again. |
|
Some of the batten strips Jeff stained this evening. They're all of various lengths depending on which log piece they were cut from. |