FRAMING & DRYWALL

7-15-11

 
 
Washing machine faucets lines and drain line are now connected, as seen from the kitchen side of the "wet wall".
The end drywall piece on the kitchen side of the "wet wall" all scribed and ready for fitting.
     
 
The fit is good!
A look at the completed corner of the kitchen.
     
 
The kitchen side of the hallway wall is drywalled now.
Stephen and Jeff cutting out an outlet box in the hallway.
<-- BACK TO "Summer 2011 Projects"  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s