ELECTRICAL
6-30-11
 
 
Paul working on the right side of the panel box.
Jeff working on the left.
     
 
Installing one of the receptacles in the log wall.
More panel box work.
     
 
Jillena somehow got under Jeff's arm to take this pic of him securing a wire to the ground/neutral bar.
Temporarily installing the outlets in the kitchen backsplash wall.
     
   
Most of the wiring is now complete in the panel box.
 