ELECTRICAL
6-24-11
 
 
Since we don't have any framed walls on the 2nd floor, we ran the ceiling fan wires down 3/4" plastic conduit and painted them black to match the black iron floor joinst brackets. After exiting the conduit, the wires run along the top of the girder...
...to a junction box where they connect to the single power feed from a switch.
     
   
The building inspector wanted to see a smoke/CO detector up around the 2nd floor area, so Jeff ran another piece of conduit up one of the middle RPSL's and mounted a box well above the floor level.
<-- BACK TO "Summer 2011 Projects"  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.