Here is one of the floor heat pumps and one of the two plastic domestic water manifolds. Each hot and cold tap in the house will receive a separate feed from these manifolds.
Here's a shot of the 1st floor heat manifolds completely connected and ready to go. The left manifold will control the bedroom/bathroom zone. The right manifold will control the rest of the 1st floor.
     
 

This is one of the basement floor manifolds, complete with the pump on the supply line.

All of the copper piping is now finished. Soon we'll be filling the system with water.