EXTERIOR STAINING & CHINKING
9-6-10
 
 
Jillena staples a strip of lath over foam board insulation.
Fletcher on the middle level and Jillena on the ground.
     
 
A closeup of how the lath is stapled to the lower log right in front of the insulation. Notice that the lath does not touch the top log. We cut the lath strips narrower for this wall, to eliminate the upper edge curling forward against the top log.
Not much left to do. We'll be chinking this wall soon.
<-- BACK TO "Summer Projects"  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s