Jeff started on the top level of the scaffolding today, attaching the final strips of lath along the narrow top joint... |
|
...then filled the large corner gaps with spray foam. Once the foam hardened, we dipped long galvanized nails in adhesive and pushed them in to give the mortar something extra to grab onto. |
Jeff put Jillena up in the bucket again, applying the base coat of stain to the outside of the overdangles - something we forgot to do a few days ago. |
|
She had nothing to worry about with her son at the controls. |
When she was finished, he even drove the excavator around to the other side of the house. |
|
Cutting a few more narrow strips of lath for the top wall joint. |
Our crew for the day: Lydia, LouElla, Diane, and Bob. |
|
Checking a larger piece of insulation for a tight fit. |
Diane cutting a new piece to size with a hand saw. |
|
Lydia stuffing a narrow piece into a gap. |
Another view of our workers. Lydia worked on the ground level while the others worked off the upper levels. |
|
A view of the area Lydia was working on from inside the house. |
From inside the house, you can see what gaps have been insulated and which areas still need attention. |
|
We really wanted to start chinking tomorrow, so Jillena and Lydia brought out the work lights and finished up their area. |