Bob has taken off the temporary floor piece that had been covering the upper half of our stairwell. |
|
Now to remove the temporary joists. |
The lower half of the staircase fit nicely against the landing (which Erin is standing on). The upper section needed some adjusting. |
|
Screwing the staircase to the side joists through spacer blocks. You can see the other block on the opposite side behind Bob. |
Jeff and Jillena christen the staircase together. |
|
Looking down the stairwell. We were very grateful for Tom and Erin's help today. |