BASEMENT FRAMING
6-25-10
 
 
The utility room is now insulated to the electric panel box, and the top and bottom plates are in place for framing.
The hole in the wall is for our high-efficiency boiler vent. We still need to insulate that upper few inches to the top of the concrete wall.