WINDOW INSTALLATION
5-15-10
 
 
The window Jeff finished yesterday is in the upper right. The next hole is already cut on the adjacent wall.
"I use hammer to bust wood from sill log!"
     
 
There's Sandy up on the first level of a scaffold tower with a scrub pad in her hand.
Dave was up on the second level getting the top logs clean.
     
 
Speaking of cleaning, even Stephen grabbed a broom and helped clean up the basement.
Lee did a great job hanging some of the radiant tubing insulation under the 1st floor.
     
 
In the afternoon, Jeff had the header and sill logs planed and the header casing board bolted in place.
At the end of the day, only one window to set and one more to hole to cut.