WINDOW INSTALLATION
5-14-10
 
 
Before lunch, Jeff had the twin frame fully installed, and completely insulated.
Here's a view through the twin at our front yard and the farm across the road.
     
 
On to the next window - a 2nd floor single on the north wall.
One of our local friends dropping off a load of fill on his way home.
     
 
The header casing board is in, and the side boards are ready to be bolted next.
Just an hour or so after this picture was taken, that 2nd floor opening had a window in it. Two to go!
<-- BACK TO "Spring Projects"  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s