Aaron and Diane defuzzing up on one of the 2nd floor girders. |
|
Dave volunteered to defuzz from the shaky wooden extension ladder. |
All of the full logs are cut out of the west opening. Notice the vertical misalignment of the logs due to each log's unique shape and bow. The north window Jeff was working on last week (also shown) is installed and insulated. |
|
Grinding the sill log down to a flat, level surface. |
We had to board up our window opening at the end of the day. Hopefully we'll finish it tomorrow. |
|
The walls are slowing filling in with windows. |