That's Jeff way up in the second floor window putting in the casing boards. |
|
After setting the frame in the opening, and securing it with a ratchet strap, the shims were put in at every screw location. |
All screwed in, the sashes hung, and insulation stuffed around the frame and casing. Another one down! |
|
On to another twin double-hung opening on the east wall. By the end of the day, the header log was cut out but not leveled. |