WINDOW INSTALLATION
4-2-10
 
 
That's Jeff way up in the second floor window putting in the casing boards.
After setting the frame in the opening, and securing it with a ratchet strap, the shims were put in at every screw location.
     
 
All screwed in, the sashes hung, and insulation stuffed around the frame and casing. Another one down!
On to another twin double-hung opening on the east wall. By the end of the day, the header log was cut out but not leveled.