6-12-10

Now that the interior staining is finished, it's time to move outside and set up scaffolding to defuzz, stain, and chink the outside of the house. The plan is to set up on the east side first (shown in the picture) and complete one entire wall, including chinking, before moving the scaffolding to the next wall. First, the ground needs to be leveled better so John fired up the bulldozer and graded around the house. Jeff added the rest of the below-grade insulation as well. In the evening, Jeff put up more radiant insulation in the basement.