CEILING COMPLETION
4-25-10
 
 
Jillena tapes the seams of the plastic vapor barrier on the south gable wall.
Here's what Jeff was working on. The bottom end of the plastic vapor barrier above the ceiling hangs down below the 2" cap board on the top log. Insulation needs to be added above and below this board before we can add any trim to the log-to-ceiling transition.
     
 
Jeff packed insulation pieces above and below the board...
...then stapled the plastic over the board.