CEILING COMPLETION
4-16-10
 
 
A look at the front of the house with the first upstairs window installed on this wall.
One of two nests Jeff found down behind the gable insulation batting.
     
 
An overhead view of Bob cutting a sheet of plastic to match the slope of the ceiling.
Looking toward the front wall at our newly-installed window and gable plastic.
     
 
The south gable wall with its plastic stapled in place.
On to fitting the final row of ceiling boards on the east side. This required a lot of patience as each piece in this last row got scribed to fit against the ridge pole.