CEILING COMPLETION
4-9-10
 
 
Before we got going on the ceiling, Jeff cut out another log section in the front wall opening. This gave us a large enough hole to toss out the log sections that had come out of the last two window openings, and get them off the floor.
Jeff and Bob stapled up the rest of the plastic next, as they waiting for Brendan to arrive.
     
 
Brendan brought a small sandblaster that Jeff used on the old wood stove to clean up the front. In this pic, the left door is done.
A nice, quick restoration.
<-- BACK TO "Spring Projects"  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s