DECK/PORCH
6-15-12
 
 
Bob's beautiful temporary steps and landing that we've enjoyed for the past few months had to be removed.   The full-length joists are all nailed in place up to the side entrance.
     
 
We decided to build the corners with a diagonal joist on each side of the corner 6x6 post, and put a filler board between them. This will allow us to lay out a 45-degree pattern with the flooring boards.   After Bob left, Jeff continued with the NE corner.