DECK/PORCH
6-7-12
 
 
We started off the day by connecting the ledger across the first two spans.   Once again, double 1/2" carriage bolts are used at these connections, this time going through the 6x6 cleats.
     
 
To carry these long spans across the back of the house, we needed triple 2x12's - two on the outside and one on the inside of the cleats.   The second deck/balcony pole is up.
     
 
The second pole is now braced.   By the end of the day, we also had the ledger in place spanning to the second balcony pole.