DECK/PORCH
5-21-12
 
 
Difficult to see in the picture, but there is a red chalk line snapped on the concrete wall that indicates top of ledger position.   Jillena lifts her end of the beam up to the chalk line.
     
 
Tapping one of the end bolts part way into the hole in the concrete.   After the opposite end bolt is tapped part way in, the beam is held in place and ready to have the beam holes marked on the concrete.
<-- BACK TO "Spring 2012 Projects"  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s