Form tubes across the front of the house. |
|
The process: first set the tube on the footer so it's fairly level and pour the concrete in. |
Then screed off the top for a smooth surface. |
|
Checking to make sure the top surface is level. |
Placing a rebar pin in the riser at the desired distance away from the foundation wall using a measured stick. This pin will protrude up into a pressure-treated 6x6 post that will top off at deck level. |
|
Checking the pin for plumb. |