Form tubes across the front of the house.   The process: first set the tube on the footer so it's fairly level and pour the concrete in.
     
 
Then screed off the top for a smooth surface.   Checking to make sure the top surface is level.
     
 
Placing a rebar pin in the riser at the desired distance away from the foundation wall using a measured stick. This pin will protrude up into a pressure-treated 6x6 post that will top off at deck level.   Checking the pin for plumb.