FRAMING
5-4-11
 
 
Looking across the top of the stairwell at the partially-framed in bathroom.
To give our finished wall material a little more stability, Jeff cut notches in the west wall logs that sat closest to the inside of the house. This reduced the size of some gaps between the end studs and the outermost logs.
<-- BACK TO "Spring 2011 Projects"  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s