FRAMING
4-29-11
 
 
Even though Jeff already ground a flat surface under the girder, the inevitable unevenness required shims before screwing the top plate in place.
Here you can see the temporary 2x4 stringers Bob tacked across the girders over the wet wall area to hold the top plate while the studs get installed. The two end studs are also visible.
<-- BACK TO "Spring 2011 Projects"  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s