To get the beam Jeff is sitting on to rest in its correct 32"-on-center position on the girder, a bit of the GSL needed to be notched.
The next set of beams that will go up, each labeled with its designated 32" increment.
     
 
Bob holds a short 6x8 piece on the north girder, as we decide how much of a cantilever we'll want to show in the open area over the living room.
Shim blocks set and anchored on the east half of the south girder.
     
   
Shim blocks on the left, and brackets on the right. We're ready to set the rest of the full-length beams tomorrow.
 