To get the beam Jeff is sitting on to rest in its correct 32"-on-center position on the girder, a bit of the GSL needed to be notched. |
|
The next set of beams that will go up, each labeled with its designated 32" increment. |
Bob holds a short 6x8 piece on the north girder, as we decide how much of a cantilever we'll want to show in the open area over the living room. |
|
Shim blocks set and anchored on the east half of the south girder. |
Shim blocks on the left, and brackets on the right. We're ready to set the rest of the full-length beams tomorrow. |
|
|