Jeff finished installing the last loop of radiant tubing under the 1st floor. The only thing left to do is secure some of the suspended send/return lines in the outside rafter bay (right, in the pic above).
Jillena and LouElla decided to benefit from their scrap wood burning efforts, so they opened the basement doors and sat by the fire, which stayed outside.
     
 
Jillena and LouElla work on the south wall over the kitchen area. Our ceiling plastic hangs down to their left.
Cleaning up the rear RPSL. Since we planned on not returning to the ceiling for 2 weeks, we freed up one of the three scaffolding towers for log scrubbing and window installation.