All of the ceiling insulation is now in, except for the partial bays that have wiring in them. |
|
A few turkeys strutting across the back lot. |
To begin the next tubing loop, Jeff drills some holes in the joists for the send and return ends. |
|
Using a scrap board as leverage behind the drill makes drilling these holes virtually effortless. |
And he's through! |
|
Jillena pulls the lead end of the loop through while Jeff feeds from the Utility Room area. |
Jillena put up a few pieces of track... |
|
...and snapped the tubing in. |