Stuffing half-wide batting in the first rafter bay at the north end. |
|
Stapling more full batts at about mid-way down the ceiling. |
One of the four fan boxes mounted in the ceiling. Here, Jeff is feeding enough electric cable through drilled holes in the rafters. You can see the excess hanging behind him against the gable wall. |
|
This pic shows the path of the electric cable from the fan box, through the rafters to the gable wall, then along the bottom of the wall through the studding toward the RPSL where it will drop down to a switch. |
This is where we stopped for the day, before heading to the basement to work on tubing. |
|
In the evening, Jeff installed all the tracking for the tubing loop he's been working on. |