2-13-10
 
 
The second loop for the main floor is now installed in the tracking.
Here's a closeup of the fancy patterns Jeff came up with to maximize coverage and heat distribution, and avoid sharp bends passing through the joists that might cause kinking.
<-- BACK TO "Winter Projects"  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s