Jeff holds the header board in place before piloting the bolt holes. |
|
Jillena drills countersink holes for the bolt heads. |
Bolting the side boards. |
|
Jillena had a nice little fire going outside to burn up the small scraps that had accumulated on the floor. |
All three casing boards are installed. We added a thin sill board for filler as well. |
|
Jillena holds the frame in before tightening the safety ratchet strap. |
Putting the jamb liners back in. |
|
Jillena took this picture of the SE corner of the house from outside while Jeff sticks his head out the newest window. |