12-27-09
 
 
Jeff holds the header board in place before piloting the bolt holes.
Jillena drills countersink holes for the bolt heads.
     
 
Bolting the side boards.
Jillena had a nice little fire going outside to burn up the small scraps that had accumulated on the floor.
     
 
All three casing boards are installed. We added a thin sill board for filler as well.
Jillena holds the frame in before tightening the safety ratchet strap.
     
 
Putting the jamb liners back in.
Jillena took this picture of the SE corner of the house from outside while Jeff sticks his head out the newest window.
<-- BACK TO CONSTRUCTION (Windows)  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s