Jillena and Jeff worked at hanging the basement entry doors in the evening. Here Jeff takes the planer to part of the casing board. |
|
Here you can see the shims that have been used to plumb this casing board. We used one rough-cut board on this side of the casing and across the header, but used a thinner 3/4" board on the other side to get the correct width across the opening. All casing boards got screwed to the form boards. |
A look at one of the doors after fastening its hinges. One more to go. |
|
Once we were satisfied with how the doors hung and closed, Jillena installed a spring-loaded bolt latch on the "dummy door". |