10-24-09
 
 
Washing the bottom wall log along the west wall.
Since this was right above our electric panel, we shut the power off at the main disconnect out by the transformer.
     
 
Looking through the Utility Room window casing.
Once the inside was finished, Jeff moved to the outside to finish up the back wall. Jillena ran the forklift for him.
     
 
With all the water blowing around inside, it became difficult to see, even with the windows unboarded.
Washing the lower logs over the doorway.
<-- BACK TO CONSTRUCTION (Windows)  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s