1-08-10
 
 
John picks up three log sections we had cut from a log off the racks and carries them over to the truck.
Two more twin windows are disassembled, stained, and laying out on the floor to dry. It will probably be 3 weeks before we can handle them.
<-- BACK TO CONSTRUCTION (Windows)  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s