10-12-09
 
 
Larry, in a cloud of concrete dust, trimming off the excess around the upper edges of the interior footer pads.
Jeff laying some custom cut pieces around the last interior pad.
     
 
Bob cutting a panel to fit around the last footer pad.
Thumbs up! It's a good fit!
     
 
Later, the guys worked on burying the sump drain pipe with stone. Here, Jeff lays some driveway fabric over the stone.
Time to backfill.
     
 
Some additional insulation was set against the wall while Jeff pushed more dirt against the house.
Next, it was back inside to cut 1/2" insulation panels to lay over the footer pads. The 2" insulation boards came up to the same height as the pads so we decided using 1/2" over the pads would still leave room for wire mesh and tubing and still allow for at least an inch of concrete floor on top.
     
 
Another good cutting job by Bob.
The insulation is finished!
<-- BACK TO CONSTRUCTION (Basement Slab)  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s