Larry, in a cloud of concrete dust, trimming off the excess around the upper edges of the interior footer pads. |
|
Jeff laying some custom cut pieces around the last interior pad. |
Bob cutting a panel to fit around the last footer pad. |
|
Thumbs up! It's a good fit! |
Later, the guys worked on burying the sump drain pipe with stone. Here, Jeff lays some driveway fabric over the stone. |
|
Time to backfill. |
Some additional insulation was set against the wall while Jeff pushed more dirt against the house. |
|
Next, it was back inside to cut 1/2" insulation panels to lay over the footer pads. The 2" insulation boards came up to the same height as the pads so we decided using 1/2" over the pads would still leave room for wire mesh and tubing and still allow for at least an inch of concrete floor on top. |
Another good cutting job by Bob. |
|
The insulation is finished! |