Originally, there was too much stone laid down across the floor so we have to take out enough to make room for insulation and our radiant heat tubing. LouElla dug our drain tile pipe out from around the basement perimeter so it could be lowered to accommodate the 2" of rigid insulation that will get laid down under the tubing. |
|
Nice work in the southeast corner. We still have to take out lots of stone from the rest of the floor. |
Meanwhile, Paul and Aaron are working hard up on the roof. |
|
Before the day was out, we got to the end of the west half of the roof, which meant custom-fitting the last row of panels. After taking some measurements up on the roof, we cut the panels in the basement with air shears. |