The day started by carrying more rafters into the house. |
|
Jeff lifts his end up to the window. |
Feeding the rafter through the window. |
|
Paul guides his end while someone on the inside hooks onto the leading end and pulls. |
The crew inside takes over, pulling the rafter up... |
|
...and into the house. |
The last of the rafters have been brought into the house. |
|
Paul and Jeff on the scaffold towers awaiting the next rafter to be lifted up to them. |
Bob lifts the first end up to Jeff... |
|
...where he takes over lifting it up and onto the wall. |
With Jeff's end sitting on the wall, Lydia raises Paul's end up to him. |
|
Paul grabs his end when the pulleys reach their maximum height. |
Matching up a pair of rafters on the peak. |
|
LouElla guides another rafter up to Jeff. |
Picking up another rafter to set on the peak. |
|
Bob was in charge of making the plumb cuts in the ends of the rafters. |
Since the circular saw didn't have the depth to go all the way through the flanges, Jillena finished the cuts with the reciprocating saw. |
|
Time to move the scaffold towers to the other side of the front girder. |
Lydia and LouElla help Matt take down a frame section. |
|
LouElla relaxing while Lydia does some housekeeping. |
Paul and Jeff installing a spacer block behind the last rafter in the middle section of the house. |
|
Matt is already up on the west tower installing more pitch brackets. |
Later in the afternoon, Paul headed out to fill in more of the water line ditch. |
|
By nightfall, only a few feet of open ditch remained, leaving our coupler exposed for leak testing. |