1010

5-25-09
 
 
More of Jeff's kerf cuts following a section he's already knocked down and planed.
Of course, taking off almost 2" means having to drive down newly exposed pins.
     
 
Paul nailed a plank to the overdangles so he could work on the cap log extensions from the outside.
Continuing to grind down the surface with the chainsaw wheel.
     
 
Looking up from the ground at Paul's new platform.
Hey Paul! Better get back to work or Jillena will make you "walk the plank"!
     
 
Paul taking a final measurement up to the string. The bubble shows he's level across.
The string shows 5" exactly - the height to the string we've been referencing for this entire cap log.
     
 
All of the exposed pins in the section Jeff worked on.
Here come the bosses!
<-- BACK TO CONSTRUCTION (FLOOR & ROOF)  

BACK TO OUR LOG HOME MAIN PAGE


If you have any questions about this website, e-mail us at stargazer@stargazerpics.com.


These pages and their contents Copyright © All Rights Reserved.
s