The panel overhanging the stairwell opening before being cut. |
|
Bob cuts the panel surrounding part of the stairwell. |
Applying adhesive before setting another panel. |
|
Jeff trims about 1/4 inch off the edge of the scribed panel around the NW GSL so that it falls on the center of the floor joist. |
Bob holds another panel before Jeff applies the adhesive to the joists. |
|
Trimming the last panel for the day. |
To prepare for the work on the center RPSLs, Bob and Jeff built a movable deck out of planks and 3 sheets of OSB. This will be used for a temporary floor over the middle area that doesn't have permanent panels laid yet, and can be positioned as close as needed to either RPSL. |
|
They also covered part of the stairwell for safety. At this point, you can pretty much walk all around the first floor on immovable paneling. |