5-4-09
 
 
Jeff cleared off the stack of OSB and made a new "work bench" out of two scrap sheets of plywood and rope.
It's sort of a suspended table, with the ropes holding everything to the concrete form ties.
     
   
The last thing he did this afternoon was work on plumbing the front RPSL. Although it may have appeared perfectly vertical, a plumb bob revealed it was off a little over an inch near the top. A long ratchet strap secured to the top of the east wall was able to pull the upper section of the RPSL into plumb. The next thing they'll have to do is install the rest of the thru-bolts that will anchor it to the wall.
 