Looking down our driveway toward the road from just beyond the midpoint. |
|
From the same location, looking up toward the house. |
A view from the northeast area of the front lawn. Look at all the fill we've gotten so far. |
|
A view from the northwest area of the front lawn, next to the driveway. |
A view from the northwest area on the west side of the driveway, at original grade level. You can see how much elevation the driveway has already. |
|
Standing on the original dirt access road next to the driveway, looking out toward the road. |
Ted enjoyed a spin on the excavator for the first time. |
|
After getting comfortable with the controls, Ted spent some time spreading a pile of ground-up asphalt over a low area of the driveway. |
After lunch, we got busy on the walls. Here Ted pushes a log outward while Paul drills and pins it in place. |
|
Tim and Paul spot the next log while Jeff lowers it into position. |
Looking out between two logs. |
|
Jeff drilling and Tim pinning the north wall. |
Ted and Paul doing a little chainsaw maintenance. |
|
Looking down at the front lawn area from on top of the wall with the driveway approaching on the left. |
With Tim's experience working with timberframers, he had no problem driving pins high in the air. |
|
Tim lifts the "wind chimes" to grab the next pin. |