Here you can see the drain tile piping laid in a narrow trench Jeff dug along the rear frost wall. After laying the piping, black protective fabric is placed over the piping, then covered with gravel. |
|
Then the dirt is spread back over the stone. Jeff then finished the run around to the west wall where the piping completed the perimeter at the sump crock. |
In the afternoon, Jeff and Bob worked on pinning the south log on the 13th course. That's Jeff doing some drilling. |
|
We also got 3 loads of fill delivered today. |