Here you can see the drain tile piping laid in a narrow trench Jeff dug along the rear frost wall. After laying the piping, black protective fabric is placed over the piping, then covered with gravel.
 
Then the dirt is spread back over the stone. Jeff then finished the run around to the west wall where the piping completed the perimeter at the sump crock.
     
 
In the afternoon, Jeff and Bob worked on pinning the south log on the 13th course. That's Jeff doing some drilling.
 
We also got 3 loads of fill delivered today.