9-27-08
 
 
 
Jeff lowers the first of the two remaining RPSLs over the west wall.
 
We set the poles next to their piers for now.
     
 
The first RPSL sitting next to its pier and strapped to the 2nd floor girder.
 
Paul bringing the second RPSL over from the log racks.
     
 
Cutting the flare off the butt end.
 
Jeff holds the cutoff so the bottom of the log won't split when the saw cuts through.
     
 
A good, clean cut.
 
Paul planes a few high spots to create a level base.
     
 
Jeff is acting a bit square ?
 
I think he's off about a quarter-bubble.
     
 
Cutting off the top of the RPSL at 40 feet - two feet more than the approximate final length.
 
Jeff holding the top cutoff while Paul cuts through.
     
 
Lifting the second RPSL over the wall.
 
Setting the butt end next to its pier while the top rests on the wall.
     
 
We lifted the top end as far as the excavator would reach...
 
...then attached block and tackle to pull the pole the rest of the way up until it was vertical.
     
 
Paul and Jillena rig up a block and tackle set in preparation to raise the pole the rest of the way.
 
Both RPSLs now in place and secured to the 2nd floor girders.
<-- BACK TO LOG STRUCTURE (PAGE 3)  

BACK TO OUR LOG HOME MAIN PAGE