John pushes dirt up against the front wall to cover 2x8 insulation panels laid on their sides. |
|
The front wall insulated and backfilled 2 feet high. |
John and Bob lay panels along the west wall. |
|
Jeff and Jillena custom cut some panels to fit around the utility inlets. |
Fitting a panel around the cable and phone inlets. |
|
The east wall, showing the fireplace bumpout with 4x8 panels held in place with some backfill. |
Jillena drove the skidsteer around and picked up a lot of the large blocks that Jeff pawed out with the excavator. |
|
Here she is scooping up some blocks - large rocks and blacktop chunks - to take over to the driveway. |