Piles of fill dirt border the house on the north and east sides. Lots of spreading and leveling to do yet. |
|
On the front side of the house, the piles are three deep. |
A Town truck delivers another load from just up the road. |
|
By the end of the day, Jeff had leveled off some of the east side piles and pulled out some large blocks to be moved to the driveway. |