The "wind chimes" loaded up with rebar pins cut to length for half of the front wall. |
|
The mallet is just visible on the wall, where Jeff resumed pinning from yesterday. |
A look at a complete NW corner. |
|
Looking up the entire west wall, but only seeing the larger logs near the bottom, Jeff leans over to check the placement of the next drilled hole. |
Drilling more of the west wall. Extra pins were used on the east and west logs (cap logs) to add additional strength for attaching the roof. |
|
Approaching the half-way point on the wall. |