John finished leveling the rest of the piles in the front yard, then moved to the west side to push a little more fill up against the basement insulation panels. |
|
Bob in his yellow rain gear... |
...and Jeff in his camo gear. |
|
After all the work they did at undoing last week's work and re-leveling the corners, Bob and Jeff brought the last two wall logs over, trimmed off the knots, and cut them down to a length of 40 feet. These are the double-butt logs that will sit on the north and south walls between the double-pass logs. They'll get cut to exact length once their up on the wall and the other two are pinned in place. |