3-29-09
 
 
Jeff narrates about the progress and his agenda for the afternoon.
 
John grading the driveway.
     
 
Jeff worked on the house by himself today, driving a few more pins in the west cap log.
John brought his new (old) dozer over and played around on the driveway and front yard area, leveling the piles that had been sitting all winter.
Within an hour or so, most of the piles were knocked down. The area is now ready for the first wave of fill deliveries of the year. Hopefully, they'll begin hauling soon.
A little difficult to see, but the left and right logs on top are the cap logs that will hold the roof. They both pass out beyond the front of the house. This is the last row!